Success stories about better ways to calibrate

2/3

Reduction in time required for performing temperature calibrations.

Cornell University's Central Energy Plant

Read the story

30 Min

Reduction of time required to perform a calibration.

Salt River Project

Read the story

50 %

Efficiency improvement for performing calibration procedures.

Miami-Dade Water & Wastewater

Read the story

We provide better ways to calibrate

Don’t take our word for it.
See what our customers have to say instead.

 

“What used to take three or four of us to do in the past, can be done by one, maybe
two of us now. Just the Beamex MC6 alone, is like having another
technician on staff.”

Read Cornell University’s Central Energy Plant’s Case Story

 

“With this software integration project, we were able to realize a significant return on investment during the first unit overhaul.”

Read the Salt River Project Case Story

 

“Beamex does not cover just the equipment, but provides excellent software to
complement the instruments.”

Read the Miami-Dade WASD Case Story

 

“Tasks that would take a month to two months to complete, could
be performed in a few weeks.”

Read Alabama Power’s Case Story

 

“Using the Beamex MC6 field calibrator and communicator for pressure calibrations has decreased the time it takes to conduct the calibration procedure itself in the field by over 80%.”

Read DC Water’s Case Story

“The results have included the retirement of 80 measurement standards which saves them $18,000 annually in re certification costs, implementation of a paperless system that is intuitive and easy to learn, improved data integrity and reliability, exposure of shortfalls in calibration of mission-critical instrumentation, and time savings of up to 50% on calibration work.”

Read Lawrenceburg Power’s Case Story

 

“We found that when using the Beamex MC6 with AMS, we are able to perform double the amount of calibrations in the same amount of time. For example, in situations where we performed 12-13 instruments a day, we can now complete 24-30. It doubles productivity while increasing accuracy of the documentation.”

Read NECI’s Case Story