|
Beamex has recently been contracted by EPR to supply their world-class integrated calibration solution for Elean Power Station – the world’s largest straw burning power station creating 38MW from burning 200,000 tons of cereal straw every year.
Beamex is proud to be part of this fantastic project helping to create power for the UK from a renewable source.
The integrated solution includes the well-respected combination of Beamex® MC multifunction documenting calibrators and Beamex® CMX Professional Calibration Software allowing the seamless and electronic flow of calibration data from calibration software to calibrator and back.
The seamless and electronic flow of data minimizes the error-prone requirement for hand-written data entry and accelerates the whole process leading to savings in time and cost. The system also documents automatically all calibration results.
In addition to the time and cost savings, other reasons for choosing Beamex® MC calibrators and Beamex® CMX Calibration Software are the capability to communicate with and calibrate HART® and Foundation Fieldbus transmitters, operate within a paperless environment, and be able to share the calibration results across a corporate network.
EPR (Energy Power Resources) is at the forefront of the renewable energy market with one of the largest and most diverse portfolios of plant in the UK, generating some 10% of the UK’s renewable electricity. |